Palace of Spectral Colours

The Höchst Industrial Park near Frankfurt am Main, Germany, is home to one of the most famous and expressive examples of industrial architecture with bricks: the administration building of Farbwerke Hoechst designed by Peter Behrens (born 1868 in Hamburg, dead 1940 in Berlin).

Description

The façade is entirely made of differently coloured bricks. The façade is structured by upwardly tapering plinths, fluting made of recessed, lighter-coloured bricks and friezes made of lighter-coloured brickwork. The bridge and the tower, which for a long time formed the Hoechst AG logo, are characteristic of the exterior appearance.

In the centre of the administration building is the domed hall. Functionally no more than a covered atrium with staircases added to the side, it is the heart of the design. The vertical design elements, pillars, walls, colours, lead the viewer’s gaze upwards to the glass domes that illuminate the space. The stepped change of colours and the structure of the brickwork are coordinated. From the bottom to the top, the colours become lighter and create the impression of growing lightness. Countering this are the brick walls, becoming increasingly massive towards the ceiling.

The exhibition hall with the bronze sculpture of “Aufbruch” adjoins the domed hall. According to Peter Behrens’ concept, the visitor’s gaze should be guided straight ahead from the entrance through the basement of the domed hall.

Colouring as a corporate image

The “Farbwerke, formerly Meister, Lucius & Brüning” in Höchst, founded in 1863, had become a globally recognised manufacturer of synthetic dyes in the period before the First World War. The colour scheme of the building refers to this. In the domed hall, the colour gradients from the base floor to the ceiling divide the space vertically. The path in the basement leading to the adjacent exhibition hall is characterised by horizontally structured colour surfaces. Plays of colour also characterise the two main staircases with their rhythmic arrangement of light and dark tiles.

Construction work in times of unrest

In August 1920, the Farbwerke asked Peter Behrens to take over the planning and construction of the new technical administration building. At this time, he was already a renowned designer and architect, especially in industrial construction. The construction work, marked by the consequences of the Treaty of Versailles, dragged on for four years. The Ruhr War, the French occupation of the Rhineland, and inflation hampered construction activity. Building materials were in short supply. Instead of using sandstone as planned, Behrens opted for regionally available bricks.

x

Related articles:

Issue 4/2017

Brick-faced concert hall

St Mary’s in Bochum, formerly a Catholic church dating from the 18th century, has become the centre of the new Bochum music forum “Anneliese Brost Musikforum Ruhr”. The architects Martin Bez and...

more
Issue 11/2010

Luther Birthplace Museum, Eisleben

With a radical restoration of the house where Martin Luther was born and the construction of two new buildings, Springer Architects have enabled an extensive reworking of the museum concept and...

more
Issue 01/2024

One stone, endless possibilities - New building for the technical school in Mechelen

As the first element of a masterplan, a new building has been created for the Technische Schoolen Mechelen in the Belgian city of Mechelen. With its almost ornamental facade, it expresses extroversion...

more
Issue 06/2022

New museum building stone by stone

In Leiden, Happel Cornelisse Verhoeven Architecten restored and extended the museum building De Lakenhal and show that brick construction in the Netherlands has a tradition and a future; and that with...

more
Issue 2/2016

New city archives in Lucerne as a contribution to cultural identity

With the new archives building of the city of Lucerne, the Zurich-based firm of architects Enzmann Fischer Partner has realized an expressive building for administration and storage of the city’s...

more