Reconstruction of a brickworks – the example of “Gubskij kirpich”
This article describes the reconstruction measures implemented at the “Gubskij kirpich” brickworks. These involved modifications to the tunnel kiln and the renewal of the wet side and the kiln car loading installation.
1 Introduction
A special feature of this plant is the ITO system with the wet bricks being set directly on the tunnel kiln cars in a direct setting mode. The kiln is positioned above the dryer. Elevators lift (from the dryer to the kiln) and lower (from the kiln to the unloading position) the circulating kiln cars and connect the dryer and the kiln in...