Search

Your search for "" found 3473 Hits

Issue 9/2011 Technical News

Multifunctional processing equipment – Händle’s new line of double-shaft screen mixers

Originally, the double-shaft screen mixer was engineered with stone-elimination in mind, but then it met with great success as a multifunctional system for mixing, moistening, steam-heating, kneading,...

more
Issue 9/2011 Technical News

Save energy with Profienergy during production breaks

Siemens Industry Sector / Industry Automation Division

The Siemens Industry Automation Division (www.siemens.com ) is now launching its first Profienergy products on the market: the Simatic ET 200S PM-E RO power module for the Simatic ET 200S High Feature...

more
Issue 9/2011 Technical News

Fast, reliable size adjustment

In order to maintain shorter-term delivery times despite smaller lot sizes, many producers are having to retool their machines at ever shorter intervals. Stems and spindles have to be reset, stops...

more
Issue 9/2011 Technical news

Automatic souring plant evacuation – Händle’s new longitudinal and cross-dredging excavators

The excavators that ­Händle engineered in cooperation with Petersen, DK-Broager, are now being manufactured by Händle ( www.haendle.com ) alone. In that connection, the entire line of...

more
Issue 9/2011

High-velocity burner for gas and oil

For years now, innova­therm has been supplying dual-fuel high-velocity burners for gaseous (natural gas or liquid petroleum gas) and liquid fuels. All it takes for the changeover is to switch burner...

more
Issue 9/2011

Improving dryer efficiency and output

1 Introduction The design of the dryer, a crucial component in the clay brick production process, has a significant influence on the type of production plant, its size and output as well as on the...

more
Issue 9/2011

A new 900 t/d plant for AKEK S.A.

1 Introduction In addition to Marcheluzzo’s reliability, it was the contractor’s willingness to tackle this challenging job that prompted AKEK to call them in. Marcheluzzo had to make do with the...

more
Issue 9/2011

Wienerberger plant in Torun´ doubles productivity following second building stage

1 Project For Keller HCW, the scope of deliveries and services for this project covered engineering, manufacturing, erection and commissioning of shaping, setting, handling and packing installations...

more
Issue 9/2011

Possibilities and limitations of energy saving in tunnel kilns

1 Introduction During the recent decades main focus was laid on the investment costs when planning the erection of new plants or the modification of existing factories. The operating costs were only...

more
Issue 9/2011

Stretch, do not shrink – the upcoming practice in the brick and tile industry

Zi: Mr Matzen, you worked for a well-known Danish manufacturer of packaging machines for quite some time. Now that you are with the Beumer Group, what are your new objectives? C. M.: I was looking...

more

Ihre Suche nach "" :

5681 Treffer in "AT Minerals"

8882 Treffer in "Bundesbaublatt"

8330 Treffer in "Betonwerk + Fertigteil-Technik"

7649 Treffer in "bauhandwerk"

1168 Treffer in "Brandschutz"

1221 Treffer in "Computer Spezial"

5344 Treffer in "dach+holzbau"

15184 Treffer in "Deutsche BauZeitschrift"

5689 Treffer in "FACILITY MANAGEMENT"

11076 Treffer in "Kälte Klima Aktuell"

5880 Treffer in "metallbau"

1531 Treffer in "recovery"

11927 Treffer in "SHK Profi"

13293 Treffer in "tab - Das Fachmedium der TGA-Branche"

12160 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2029 Treffer in "tunnel"

5786 Treffer in "Zement Kalk Gips"

3473 Treffer in "Ziegelindustrie International"