Brick firing in an electrically heated kiln

ONEJOON GmbH, which specializes in the development and construction of kiln systems, demonstrates that there is also room for further development in the firing of bricks.

Brick firing in an electrically heated kiln is possible and, in our opinion, the better process, as the focus here is on the thermal treatment of the bricks and not on the limits of combustion dictating the cycle.

The ‘electric kiln’ does not require the immense amounts of air that exceed production capacity many times over, thus offering opportunities for cost savings. Contrary to the opinion of many sceptics, the required heat transfer can also be achieved through structural optimisation of the plant in order to maintain the usual production rates.

The following presentation will discuss the finer points of design and validation options from a process engineering perspective in order to exploit the potential for further development.

At ONEJOON, we are convinced that the electrification of brick firing is only just beginning.

x

Related articles:

Issue 05/2025

The electric double-track kiln from ONEJOON

With the electrically heated industrial kiln at the Helpfau-Uttendorf brickworks in Austria, Wienerberger has created a very special piece of equipment. Apart from its electrically generated...

more
Advertorial / Advert

A flagship project for sustainable brick production

90 % reduction in CO2 footprint: wienerberger's modernized Uttendorf (Austria) demo plant is driving forward climate-neutral brick production. At the heart of this is a high-efficiency kiln from...

more
Issue 6/2019

The electric tunnel kiln – challenge, heat transfer

It is the year 2050. Greenhouse emissions have been reduced by more than 80% in Germany. CO2 trading has long ceased in the building ceramics industry. The thermal processes, especially firing, are...

more
Issue 04/2025

Between costs and carbon dioxide - a visit to the purely electrically operated high-efficiency brick plant of Wienerberger Austria

The Helpfau-Uttendorf plant Wienerberger acquired the Helpfau-Uttendorf plant near Braunau am Inn in Upper Austria in 1987, where around 50 million non-insulating clay blocks for external and internal...

more
Issue 09/2009

The role of the combined heat system in the brick plant

1 Introduction The combined heat system between the kiln and dryer was already used in individual cases at the beginning of the 20th century in large-volume dryers arranged above the annular kiln...

more