The role of the combined heat system
in the brick plant

This article describes the influence of the combined heat system on the dryer and kiln operations and demonstrates how the release of cooling heat from tunnel kilns can be reduced. In order to illustrate the possibilities for lowering the release of cooling heat from the kilns, above all in regard to the use of low-energy dryers, the paper outlines not only the historical development of the installations in the cooling zone but also their influence on the kiln operations and the heat ­release of the kiln. Furthermore the theoretical explanations on kiln operation without the combined heat system are supplemented by examples for optimum practical implementation in terms of technical equipment. Here the paper distinguishes between kilns with small and large raw material enthalpies.

1 Introduction

The combined heat system between the kiln and dryer was already used in individual cases at the beginning of the 20th century in large-volume dryers arranged above the annular kiln (1903, fan heating at the Brüggener Tonwerke [18]). It was only from the 1950s onward that the combined heat system experienced a wider distribution, above all in the German-speaking countries, with the introduction of the tunnel kiln and artificial drying. In other countries (for example in France) there is even today still a large number of brick plants which do not have a combined heat system...

Related articles:

Issue 8/2015 Prof. Dr.-Ing. Christian Schäffer

Combined kiln-dryer heating systems with thermochemical heat storage

1 Introduction In Zi Brick and Tile Industry International 7/2015, the concept of a brickworks with a “hybrid-ring tunnel kiln” was presented, in which the kiln cooling/dryer combined heating system...

more
Issue 7/2015 Prof. Dr.-Ing. Christian Schäffer

Hybrid-ring tunnel kiln with flue-gas-based combined heating system: 65% savings on energy – a concept study

1 Introduction The concept begins by dissolving the kiln/dryer combined heating system, instead supplying the dryer with energy via exergetically optimized heat flow from the kiln exhaust and power...

more
Issue 06/2013

Utilization of Waste Heat and Combined Energy Systems in Brick Plants

1 Introduction Owing to the combination of the heat systems of dryer and kiln, the dryer often remains undetected as the major consumer of energy in a brick plant. For the most part, the installation...

more
Issue 05/2012

Firing technology for energy-rich raw materials

1 Project definition The sought-after characteristics of porous backing bricks, such as low body density and high heat insulation, are achieved for instance with the addition of porosity-enhancing...

more
Issue 4/2020 Dr.-Ing. Tino Redemann, Prof. Dr.-Ing. Eckehard Specht

Simulation of the firing of ceramic ware Part 2: Roadmap for CO2-free brick production by 2050

1 Introduction Firing bricks in the tunnel kiln is a high-temperature process and therefore energy-intensive. The energy costs make up a significant part of the production costs. It is to be expected...